Diagnostic investigation: high pressure, Boiler-01
Incident INC-2025-0512 · Alert raised 09:15 · Asset Boiler-01 (generic tag) · Investigation opened from the alarm list
Event summary
- Event
- Boiler pressure high
- Observed value
- 9.8 bar
- Threshold
- > 8.5 bar
- First detected
- 09:15
- Asset
- Boiler-01
- Related past incidents
- INC-2025-0481, 0467, 0452
Correlated signals Pressure and control-valve position on one time axis
Pressure (bar, left axis)Control-valve position (% open, right axis)Alarm threshold
Evidence What has been observed or recorded, kept separate from interpretation
- E1 · Pressure above threshold since 09:15Observed signalPressure transmitter, Boiler-01. Peak 9.8 bar against an 8.5 bar limit.
- E2 · Control valve partly closedObserved signalValve position feedback fell from about 62% to about 35% open before the pressure rise.
- E3 · Pressure moves with valve positionDerived correlationCorrelation over the same window. Correlation does not establish cause.
- E4 · Valve maintenance overdueMaintenance recordScheduled service for the pressure control valve is past due.
Candidate hypotheses Proposed, not confirmed
H1 · Faulty pressure control valveSupported by E2, E3, E4. Suggested by the analysis assistant; requires engineer confirmation.
H2 · Pressure sensor calibration overdueFrom the cause map (D2). No supporting evidence linked yet.
H3 · Inadequate pressure-relief procedureFrom the cause map (D2). Not yet assessed.
No likelihood or confidence score is shown: none has been validated for this workflow.
Human review
- Event detectedAlarm raised automatically, 09:15
- Signals correlatedPressure and valve position aligned in time
- Evidence and hypotheses reviewedReviewer: on-shift process engineer
- Decision: confirm or reject H1Pending
- Action and hand-off recordedPending
Decision not yet recorded.
Proposed next steps Require approval
- Replace pressure control valveOnly if H1 is confirmed
- Verify system pressure after replacement
- Update the preventive-maintenance schedule